DE EN

A) Segment blocking and unblocking, and job creation based on status messages from a station.


B) Forwarding of the foremost vehicle if waiting segments are overfilled.


C) Automatic recharging of vehicles considering a threshold variable.


D) Reading of a material number scanned by the vehicle and comparison with the current load request.


E) Creation of a fire alarm script. In case of a fire alarm all gate regions will be cleared before all vehicles stop.


F) Extend envelope in specified segments to prevent traffic jam.